Time to finaly get the girliebike on its own feet.
Must say it looks awesome.
The enthusiasm dip i had earlier this autumn is long gone now.
This gonna be good for real !!!
Saturday, November 28, 2015
Wheels
So the wheels came back from the rubber man.
Looks awesome, 17" & 21" was a wise choice.
Time for some real mockup now....?
Looks awesome, 17" & 21" was a wise choice.
Time for some real mockup now....?
Monday, November 23, 2015
Monday, November 16, 2015
More pipes
So the pipework continues.
I left the idea with thick wall piping...for now.
This time I'm cutting up OEM Harley pipes instead.
The other big job with the pipes except positioning the turbos is to step them down from 1 3/4" to 1", what that the turbos have as inlet.
Did some calculation and came up with I have to shrink the circumference from 139,5mm to 79,8 mm.
To manage that I did 8 triangular slots 7,5 mm wide at the top.
This is just a measuring prototype and the final pipes must have some more massage first for the right angles out of the heads to position the turbos.
Buts that's another post......
I left the idea with thick wall piping...for now.
This time I'm cutting up OEM Harley pipes instead.
The other big job with the pipes except positioning the turbos is to step them down from 1 3/4" to 1", what that the turbos have as inlet.
Did some calculation and came up with I have to shrink the circumference from 139,5mm to 79,8 mm.
To manage that I did 8 triangular slots 7,5 mm wide at the top.
This is just a measuring prototype and the final pipes must have some more massage first for the right angles out of the heads to position the turbos.
Buts that's another post......
The 1 3/4" pipe i started with.
The 1 3/4" pipe with slots.
The stepped down end ready for weld.
And the finished testpiece next to the flange.
Think I´m on the right track here, but I have not abandoned the idea with more rigid thick wall piping.
Time will tell wich alternative will walk away as the winner.Sunday, November 1, 2015
First cut...
The first header pipe cutting exercise just happened.
Number one of MANY before the little snails are mounted for real.
This test fit felt wrong before I even started to weld.
But what the heck, I must start somewhere to make this to the Cosmic Dreamer it will be in the end.
Number one of MANY before the little snails are mounted for real.
This test fit felt wrong before I even started to weld.
But what the heck, I must start somewhere to make this to the Cosmic Dreamer it will be in the end.
The first, way to snug test fit.
Wednesday, October 28, 2015
The christening
Any project should have a working name and so does mine......from now on.
Hereby I baptise you to Cosmic Dreamer, or CD for short.
Cosmic Dreamer, a suitable name for a build like this.
A girlie bike with out there, dreamy specs, use and time frame. *Hehe*
Hereby I baptise you to Cosmic Dreamer, or CD for short.
Cosmic Dreamer, a suitable name for a build like this.
A girlie bike with out there, dreamy specs, use and time frame. *Hehe*
Cosmic Dreamer
Sunday, October 25, 2015
Note to self.... Sportster front hubs SUCK!
I have now laced three front Sportster front hubs.
The first, LAST & ONLY.
A Wideglide/rear hub is a walk in the park compared to this.
But now its finally laced and truing is up next.
Truing that I normally dread will be like meeting an old friend compared to lacing.
The first, LAST & ONLY.
A Wideglide/rear hub is a walk in the park compared to this.
But now its finally laced and truing is up next.
Truing that I normally dread will be like meeting an old friend compared to lacing.
First I gave the brand new Morad rim a quick polish with the machine and then by hand.
Then some protective tape to save the delicate, shiny rim.
And then the madness begun...... There was times when I was very near a breakdown but finally I walked away as the winner.
Subscribe to:
Posts (Atom)