OSB wall...two of two

Next wall is not only twice as long, it have at least twice as many challenges.
First the cutting around the door.
Next is the pipe from the second floor.
I wanted to cover that pipe, but also have a  hole so i could reach the inspection lid
On top of that I had to struggle with radiator piping.
I made the decision to cover it all.
Mostly because there was not room enough between the pipes and the wall for the OSB board.
Made like a “box” over it all and made a hatch to reach the inspection lid.
Turned out great
Both the pipe from upstairs and the radiator pipes is suddenly gone.